Shop online Secure checkout Worldwide delivery Free shipping on orders over $100 WhatsApp +86 133 9699 6593

LG07

Electrical and Pneumatic Lockout Kit | LG07

SKU: LG07MOQ: 2 unit
$53.55 / unit
Product details

A carry-bag kit covering a selection of plug, breaker, control-button and pneumatic isolation devices, with padlocks and hasps.

Product features

  • Preconfigured equipment selection with a dedicated carrying container.
  • Model-level contents list identifies each supplied item.
  • Padlock key arrangement and substitutions can be specified for an order.

Specifications

Model LG07
Supply configuration Catalogue standard kit
Container model LB03

Standard kit contents

Model Item Quantity
LB03 Lockout bag 1
SH01 Steel hasp 1
SH02 Steel hasp 1
LP01 Laminated padlock 1
LP05 Laminated padlock 1
P38S-RED Red safety padlock 2
EPL01 Plug lockout 1
EPL02 Plug lockout 1
CBL11 Breaker lockout 1
CBL12 Breaker lockout 1
POS Pin-out standard breaker lockout 1
PIS Pin-in standard breaker lockout 1
POW Pin-out wide breaker lockout 1
CBL01-2 Breaker lockout 1
CBL02-2 Breaker lockout 1
SBL03 Button lockout; catalogue base code 1
SBL01 Button lockout; catalogue base code 1
ASL02 Pneumatic fitting lockout 1

Selection notes

Select the kit against the actual equipment and isolation points. The contents below describe the catalogue standard configuration; custom substitutions change the kit.

Customization

Contents, padlock key arrangement and marking.

Product details

LG07 product information

LG07 product information

More than the device

Support for the complete requirement.

Share the application, quantity, destination and customization details. PROLOCKEY can help coordinate product selection, configuration and supporting documents.

01 / SELECT

Application guidance

Match the product family and configuration to the energy-isolation point and maintenance task.

02 / CONFIGURE

OEM & customization

Discuss color, logo, laser marking, labeling, packaging, keying and project-specific combinations.

03 / DOCUMENT

Applicable documents

Confirm product specifications, certificates, test reports and documentation relevant to the item and market.

04 / DELIVER

Order coordination

Align quantity, production, packing, freight and export requirements with the sales and operations team.

Certification scope and lead time vary by product and order. Ask the sales team to confirm the applicable documentation and schedule before purchase.

01 / Request details

What are you sourcing?

Request type

By submitting, you agree that our sales team may contact you about this request.